Moving drill and blast Plods off paper means drillers log each hole in an app during the shift, and supervisors approve the record online instead of re-keying paper sheets. For most contractors, the first few weeks come down to two jobs: setting up contract rates and patterns, and getting drillers comfortable with the app on the bench.
Here’s what that looks like with CorePlan Drill & Blast, CorePlan’s drilling and revenue management platform for surface drill and blast contractors, and what to plan for if your crews are starting from paper. The platform is already being trialled on site with Ausdrill, one of Australia’s largest drilling contractors.
What needs to be set up before the first shift? Before the first shift, CorePlan Drill & Blast needs two things set up: your cost contract and the client’s blast patterns.
Start with the cost contract: your rates and delay categories are set up once per project, so every Plod is costed the same way from the first shift.
Next come the patterns. Each pattern is created with a pit, bench and blast, then its holes are imported from the client's CSV. Most drill and blast operations already get patterns as CSV files, often the same files loaded onto the rig by USB, so the format should feel familiar. If a row has a problem, the import tells you which row and field, and nothing loads until the whole file is clean. Local mine grids are supported, so holes sit in the right place on the map.
It's worth starting with one site, so you can sort out the setup and devices on a single operation before going further. A busy site with plenty of patterns on the go will quickly show you whether the setup fits the way your crews work.
Then sort out devices. The CorePlan Drill & Blast app is built for tablets, which Australian crews can generally use in the cab, and it works offline, so drillers can log a full shift with no signal on the bench. Where device rules keep tablets out of the cab, a supervisor or control-room clerk can enter the Plod on the driller’s behalf instead.
What do drillers do in their first shifts with CorePlan Drill & Blast? In their first shifts, drillers use the CorePlan Drill & Blast app to log each hole as they drill it.
Before heading out, they sync the app and start a Plod for the shift. Most of the details carry over from the setup, so they’re mainly picking the pattern and the rig.
On the bench, one tap fills the planned depth and marks the hole finished, and wet holes and collar pipes are tick boxes. One timer runs across the whole shift, and another times each hole as it’s drilled. Activities like pre-starts and standby go on the shift timeline as they happen.
Speed was the design brief. A blast hole can take around a minute and a half to drill, so even a few extra seconds per entry adds up across a shift. If logging a hole slows a crew down, they'll go back to paper. At the end of the shift, the driller submits the Plod.
If it helps your crews settle in, run the app alongside the paper Plod for the first few shifts. Comparing the two gives drillers confidence and gives supervisors a quick check that nothing's being missed.
How do supervisors approve Plods in CorePlan Drill & Blast? Supervisors review and approve each submitted Plod in the CorePlan Drill & Blast web portal, and can edit times and holes first, so a messy entry doesn’t have to go back to the driller.
Drilling intervals sit in their own tab, and the shift timeline shows activities and delays in order. Once a Plod is approved, CorePlan Drill & Blast costs it against your contract rates, so it’s ready for month-end invoicing without anyone re-keying it.
Client approval is optional and set per project. Some contractors keep approval to their own supervisors, and others have the mining client sign off Plods in CorePlan. Either way, you control what the client sees.
During the shift, each pattern shows holes and metres drilled against plan as entries sync. That's usually the point where supervisors notice the difference, because the numbers for the morning meeting are already added up.
How do you make digital Plods stick in the first few weeks? Digital Plods stick when the first few weeks include regular check-ins, so drillers and supervisors can flag what’s slowing them down.
Expect a few rough shifts early on. A delay code that doesn't match how your crews talk, or a field nobody uses, is easy to fix once you've seen a handful of real Plods come through.
You won’t be doing it alone. The CorePlan team helps set up your contracts and patterns and runs the check-ins with you in the first few weeks. If your crews get stuck, they can call us, or message us in the app or by email, and we'll get back to you within 15 minutes.
Those check-ins also give you a chance to adjust the setup before it becomes a habit. You’ll know it’s working when Plods come in every shift without chasing, and the admin team stops rebuilding the month in Excel.
How do you roll out CorePlan Drill & Blast to more sites? Rolling out CorePlan Drill & Blast to more sites is mostly a repeat of the first setup, with a cost contract and patterns for each new project.
Once the first site is running smoothly, drillers on each new site follow the same workflow. It helps to agree early who owns what day to day. Usually drillers or clerks enter the Plods and supervisors approve them. The admin or accounts team then works from approved Plods at month end.
How do you get started with CorePlan Drill & Blast? The best way to get started with CorePlan Drill & Blast is a demo using a pattern and contract that look like yours. From there, the CorePlan team can talk through how a first site would roll out for your operation.
See CorePlan Drill & Blast on your own patterns and contracts . Already a CorePlan customer? Talk to your account manager.
Frequently asked questions How long does it take to move drill and blast Plods off paper? It depends on how many sites and rigs you start with. Most of the early work is setting up contract rates and patterns, and getting drillers comfortable logging holes in the app, so starting with one site lets you sort out the setup before rolling out further.
Do drillers need much training to use CorePlan Drill & Blast? CorePlan Drill & Blast is designed for the bench, so most entries are a tap or a tick box. Drillers pick the pattern and rig at the start of the shift, then work through the holes, and the rest of the details carry over from the setup. Hundreds of drillers already log their Plods in CorePlan for exploration drilling, and the feedback is consistent: crews pick it up quickly, often with very little training.
Will our drillers actually use a tablet? CorePlan Drill & Blast was built around the pace of production drilling. Planned depth fills in with one tap, and the bit and hammer carry over for the whole shift, so most of a driller’s entries are taps.
What if tablets aren't allowed in the cab? A supervisor or control-room clerk can enter Plods on the drillers' behalf. The Plod still goes through the same review and approval before it's used for invoicing.
What happens when there's no signal on the bench? Drillers can log a full shift in CorePlan Drill & Blast with no signal. The Plod syncs when the device reconnects, and supervisors see the pattern update as soon as those entries come through.
Does our client have to use CorePlan? No, client approval is optional and set per project. Contractors can keep approval to their own supervisors, or invite the client to review and sign off Plods in CorePlan.